Welcome to BigJimny

BigJimny is YOUR resource for everything to do with Suzuki Jimnys.
If you are new to the site then REGISTER through the LOGIN button

There is a friendly, active FORUM to discuss Jimny related subjects and a web SHOP for all your parts needs.

AS WITH ALL WEBSITES YOUR ATTENTION IS DRAWN TO THE DISCLAIMERS . As this website does not require a login to access content, the accessing of this website and associated resources is deemed acceptance of these DISCLAIMERS. Do NOT progress if you do not accept the DISCLAIMERS

Lil Red - SJ restoration - Wings and Wheel Arches

Processed-WhatsApp-Image-2023-03-28-at-07.24.3211

As mentioned in the previous post for James' SJ, things are starting to go back together. Having bolted down the body it is time to add the doors and tailgate back on to align all the panels and weld them back in place.

After all the filling, sanding and priming, the first step is to ensure all the threads are cleaned out so that the bolts can be run in and out smoothly.

The doors and inner wing threads were cleaned


Continue reading
  899 Hits
Tags:
899 Hits

Lil Red - SJ restoration - Body Mounts

Just a quick update.

Whilst seemlingly small this is an important milestone. Having painted the doors, tailgate and window frame parts separately. The time has come to join the body back to the chassis.

Early in the build the body was separated from the chassis to facilitate access to the corroded areas, although the previous pictures show the body apparently on the chassis, it was only loosely fitted and some of you may have noticed the apparent "lean" that that generated.

The time has arrived to weld the wings back onto the car and an important part of this is ensuring that the panels all line up, any panel gaps are even and all the shut lines line up. 

Therefore the body needs bolting back onto the chassis so the panel alignment can be accurate.

 

Continue reading
  593 Hits
Tags:
593 Hits

Lil Red - SJ restoration - First Paint

Its time for painting to start!

First there were a couple of small repairs left to door, Earlier you would have seen small perforations that had appeared in the bottom of the door.

These were removed and cleaned out and then filler welds were added to create an all metal finish that was then smoothed back.

Continue reading
  503 Hits
Tags:
503 Hits

Lil Red - SJ restoration - Patching completed

Processed-WhatsApp-Image-2023-02-27-at-15.23.071

 Work is really progressing this week over at Winchfield Engineering. The welding patching to the bodywork is complete. The welds have been ground back smooth and now a protective coat of epoxy and Cobra (for the undersides) is put on in the paint shop to protect the bare metal until the full painting starts.

The next stage should see the wings being re-fitted.

Continue reading
  527 Hits
Tags:
527 Hits

Lil Red - SJ restoration - Welding has started!

Processed-7-WhatsApp-Image-2023-02-21-at-097

The restoration has turned a corner, things are starting to go back together rather than come apart.

The welding has started with patching/repairs of holes. 

NOTE: These pictures show work in progress, not necessarily completed, 

The most common place for corrosion on both SJ and later Jimnys is around the body mount behind the front seats.

The bodywork here is a sandwich of steel panels. Here the top panel has been cut and removed to reveal the rust in the panel behind which has then been cut out and removed (you can see the body mount!)

The holes are then plated over, closing them up.

Continue reading
  554 Hits
Tags:
554 Hits
We use cookies to give you the best online experience. Please let us know if you agree to all of these cookies. Accepting the Cookies also accepts the Disclaimers for the website.