Welcome to BigJimny

BigJimny is YOUR resource for everything to do with Suzuki Jimnys.
If you are new to the site then REGISTER through the LOGIN button

There is a friendly, active FORUM to discuss Jimny related subjects and a web SHOP for all your parts needs.

AS WITH ALL WEBSITES YOUR ATTENTION IS DRAWN TO THE DISCLAIMERS . As this website does not require a login to access content, the accessing of this website and associated resources is deemed acceptance of these DISCLAIMERS. Do NOT progress if you do not accept the DISCLAIMERS

Lil Red - SJ restoration - Preparing the Roll Bar

IMG_20230218_152638907

James wanted a genuine rollbar for his SJ. Now we realise that these roll bars are little more than show items, they are not a competition grade roll bar but it is a factory restore so needs a factory roll bar.

We eventually found one on Ebay. It was not easy to find one but it has been even harder to restore it!. It comes with a white "plastic" coat that at first appears easy to remove as the rust is lifting it up. I took it to the Powder Coaters and they sent it back saying that it simply melted and flowed back whenever they blasted it. In other words, it could be done but would be too expensive in time and money. I then tried sanding, burning with a blow torch and peeling with a sharp edge. It simply would not come off. It took an abrasive wire wheel in an Angle Grinder and close on 4 hours work to shift it.

  1367 Hits
Tags:

Lil Red - SJ restoration - Welding has started!

Processed-7-WhatsApp-Image-2023-02-21-at-097

The restoration has turned a corner, things are starting to go back together rather than come apart.

The welding has started with patching/repairs of holes. 

NOTE: These pictures show work in progress, not necessarily completed, 

The most common place for corrosion on both SJ and later Jimnys is around the body mount behind the front seats.

The bodywork here is a sandwich of steel panels. Here the top panel has been cut and removed to reveal the rust in the panel behind which has then been cut out and removed (you can see the body mount!)

The holes are then plated over, closing them up.

  5460 Hits
Tags:

Lil Red - SJ restoration - Patching completed

Processed-WhatsApp-Image-2023-02-27-at-15.23.071

 Work is really progressing this week over at Winchfield Engineering. The welding patching to the bodywork is complete. The welds have been ground back smooth and now a protective coat of epoxy and Cobra (for the undersides) is put on in the paint shop to protect the bare metal until the full painting starts.

The next stage should see the wings being re-fitted.

  1364 Hits
Tags:

Another SJ Build - Sam's Yellow SJ - An update

image1

Sam has sent in an update on the progress of his SJ. Many thanks Sam!

These SJ restoration projects are proving popular at the moment, if you have some work in progress why not send in the details to show them on this website? 

As you can see, the body was stripped of all major components and then removed from the chassis.

In Sam's case this was to assist in a planned upgrade from the 4 speed gearbox to a 5 speed along with a general rebuild of the transmission.

  1637 Hits
Tags:

Another SJ Build - Sam's Yellow SJ

IMG_5324

Sam Emery spotted the start of the work on our SJ and sent over a few pictures of his own build which is starting at the same time as ours. 

  1421 Hits
Tags:
Joomla template by a4joomla
We use cookies to give you the best online experience. Please let us know if you agree to all of these cookies. Accepting the Cookies also accepts the Disclaimers for the website.